Where it is used
Creates the metal supports and connection parts between the glass system and the main structure of point-fixed glass façades.
Preparing the metal structure and connection details of point-fixed glass façades for fabrication. The glass system, the structural design and the connection interfaces are reviewed together.

Creates the metal supports and connection parts between the glass system and the main structure of point-fixed glass façades.
Unlike a glass partition with a continuous metal frame, the façade glass fixings follow the coordinates of the chosen point-fixed system.
How the product is built and its project-based options. Exact dimensions and materials are defined in the technical review.
| Product / application type | Spider façade metal supports |
|---|---|
| Body and main components | Metal supports and point-fixing interfaces for glass façades |
| Material and finish options | Steel / stainless sheet and section options; material grade and thickness are set by the project requirements. |
| Connections and use | Shared coordinates of the glass system and the architectural/structural design |
| Dimensions and configuration | Made to measure; width, length, height, sections and quantity are confirmed in the technical review. |
The image is a representative concept. Dimensions, materials and delivery scope are defined per project.
The key choices when adapting the product to your application.
Glass modules, spider fixing points and the main structural grid are assessed in the same coordinate system. Metal fabrication dimensions are matched to the approved technical data of the glass system.
The interfaces needed for building movement and installation tolerances are handled from the inputs of the authorised system designer. These needs are not assumed to be met simply by changing holes or parts on site.
The order in which the structure, fittings and glass panels are placed is planned. Access to tightening points and the space needed to replace a panel later are reviewed.
Not every detail needs to be ready at the start. Along with existing drawings and dimensions, you can also note the points that are still open.
Project preparation guide →The drawing revision, target quantity and planned timing help assess the scope. You do not need to upload confidential files.
Glass manufacturing, system certification and engineering approval are not automatically included.
Material, finish and assembly decisions are clarified from the drawings and conditions of use. The choice of operations and the form of delivery are written into the quotation.
Material and finish decisions →
Image & specifications ↗We handle metal-framed glass panel layouts that divide an interior visually.
Product image and specifications →
Image & specifications ↗A metal holder arrangement that fixes the glass surface at specific points.
Product image and specifications →
Image & specifications ↗For steel structures and load-bearing work we handle the fabrication drawings and the site assembly plan together.
Product image and specifications →