Made for your project · MADE TO ORDER

Metal-framed glass partitions

We handle metal-framed glass panel layouts that divide an interior visually. Profile lines, panel sizes and any door leaf are developed together with the architectural layout.

Where it is used

Creates the metal frame and fixing arrangement of glass panels that divide interior areas without closing off the view completely.

What sets it apart

Unlike an open lattice or a cut metal screen, the partition surface is glass and the perimeter line is the metal frame.

Metal-framed glass partitions

Product specifications.

How the product is built and its project-based options. Exact dimensions and materials are defined in the technical review.

Metal-framed glass partitions — construction, options and scope
Product / application typeMetal-framed glass partitions
Body and main componentsMetal profile frame, glass panel interfaces and door details
Material and finish optionsMetal structure and glass interface; the choice of metal and the glass make-up are assessed per project.
Connections and useArchitectural grid, glass system and connections to the existing building
Dimensions and configurationMade to measure; width, length, height, sections and quantity are confirmed in the technical review.

The image is a representative concept. Dimensions, materials and delivery scope are defined per project.

DECISIONS FOR YOUR APPLICATION

The details
make the right solution.

The key choices when adapting the product to your application.

01

Panel layout

Fixed panels, door openings and module lines are set from the plan and elevations.

02

Glass interface

The glazing rebate, fixing and contact details are handled according to the glass type and the supplier's requirements.

03

Floor and ceiling fixing

The flatness of existing surfaces and the fixing conditions are assessed together with installation tolerances.

PROJECT INPUTS

Start the technical review
with the right information.

Not every detail needs to be ready at the start. Along with existing drawings and dimensions, you can also note the points that are still open.

Project preparation guide →
  • Partition layout and dimensions
  • Glass and door leaf preference
  • Floor, ceiling and wall information
  • Finish and visible profile expectations

The drawing revision, target quantity and planned timing help assess the scope. You do not need to upload confidential files.

MANUFACTURING & DELIVERY SCOPE

We define the requirement
before the method.

Glass supply and verification, acoustic or fire classification are defined separately; no general partition performance is claimed.

Material, finish and assembly decisions are clarified from the drawings and conditions of use. The choice of operations and the form of delivery are written into the quotation.

Material and finish decisions →

Related products and alternatives.

Architectural & custom projects →
Enlarged view of the selected product imageOpen image separately →