Industrial systems · MADE TO ORDER

UPS, rectifier and regulator cabinets

In UPS, rectifier and regulator cabinets, an orderly layout of different electronic modules and service access come first. The body is shaped by the specified cooling and cable arrangement of the equipment.

Where it is used

Metal bodies with covers that arrange UPS, rectifier and regulator modules on shelves or mounting plates.

What sets it apart

Unlike the module storage layout of a battery cabinet, access to the power conversion hardware and the cooling interfaces come first.

UPS, rectifier and regulator cabinets

Product specifications.

How the product is built and its project-based options. Exact dimensions and materials are defined in the technical review.

UPS, rectifier and regulator cabinets — construction, options and scope
Product / application typeUPS, rectifier and regulator cabinets
Body and main componentsFloor-standing metal body, doors, removable panels, internal mounting area
Material and finish optionsSteel / stainless sheet and section options; material grade and thickness are set by the project requirements.
Connections and usePlinth or floor fixing; cable and ventilation openings
Dimensions and configurationMade to measure; width, length, height, sections and quantity are confirmed in the technical review.

The image is a representative concept. Dimensions, materials and delivery scope are defined per project.

DECISIONS FOR YOUR APPLICATION

The details
make the right solution.

The key choices when adapting the product to your application.

01

Module layout

Shelves, mounting plates and fixing holes are made to the dimensions of the modules to be fitted.

02

Service access

Front, rear or side access needs are reviewed together with module removal and cable connection routes.

03

Cooling interface

Fan and vent positions are coordinated with the airflow needs specified by the equipment designer.

PROJECT INPUTS

Start the technical review
with the right information.

Not every detail needs to be ready at the start. Along with existing drawings and dimensions, you can also note the points that are still open.

Project preparation guide →
  • Module dimensions and layout
  • Service directions
  • Cable and connection layout
  • Thermal management requirements

The drawing revision, target quantity and planned timing help assess the scope. You do not need to upload confidential files.

MANUFACTURING & DELIVERY SCOPE

We define the requirement
before the method.

Electronic power conversion and device performance are outside the scope; the mechanical design is assessed with the inputs of the device manufacturer.

Material, finish and assembly decisions are clarified from the drawings and conditions of use. The choice of operations and the form of delivery are written into the quotation.

Material and finish decisions →

Related products and alternatives.

Industrial equipment cabinets →
Enlarged view of the selected product imageOpen image separately →